AM | EN | RU
  • Home
  • About Us
  • Products & Categories
  • Projects
  • Videos
  • Contact Us
Follow us on:
  • Home
  • About Us
  • Products & Categories
  • Videos
  • Projects
  • Contact
  • AM
  • EN
  • RU

TELLERMUTTER - for thread 15/17 mm

Plate nut made of cast iron for tie rods with DYWIDAG thread 15 mm. The plate nut differs from the wing nut in a larger contact surface. This allows a direct support on the formwork.

Formwork Accessories
Climbing Platform

A massive bracket platform for use as working-, safety- and climbing scaffold.

Formwork Accessories
VERBINDUNGSMUFFE - for thread 15/17 mm

Cast iron tie bar connector for tie rods with DYWIDAG thread 15 mm. For the force-fit connection of two tie rods.

Formwork Accessories
Stacking Pallets

​​​​​​​​​​​​​​For better logistics on site, in storage and transport.

Formwork Accessories
FEDERSTAHLBINDER

Elastic spring clips for quick and easy connection of reinforcing steel. Completely without tools. Supplied on cardboard strips.

Formwork Accessories
NEVO-CONNECT® - Fibre concrete cover

NEVO-CONNECT® the innovative screw connection for prefabricated reinforced concrete components enables direct screwing of reinforced concrete components for all standard connections of large panel construction. NEVO-CONNECT® combines the advantages of a dry connection with the requirements for the lowest possible assembly tolerances and the qualification of the staff used. Fibre-reinforced concrete cover to close the recess after installation of the wall elements.

Formwork Accessories
NEVO-CONNECT® - Anchor block

NEVO-CONNECT® the innovative screw connection for prefabricated reinforced concrete components enables direct screwing of reinforced concrete components for all standard connections of large panel construction. NEVO-CONNECT® combines the advantages of a dry connection with the requirements for the lowest possible assembly tolerances and the qualification of the staff used. The anchor block enables the connection of the system screws and with this the connection to the screw guide during the assembly of the wall elements.

Formwork Accessories
HOHLWANDDÜBEL-PLUS MASSIVWAND - "K" with adhesive plate

Hohlwanddübel-Plus for temporary fastening of props and corner brackets to solid walls in the assembly state. The Hohlwanddübel-Plus is positioned on the formwork at the factory using hot glue. Best possible hold due to roughened adhesive surface with Ø 50 mm. A small recess in the adhesive plate ensures minimum consumption of hot glue. Alternatively, the Hohlwanddübel can be attached to steel formwork tables with an adhesive pad (double-sided adhesive on carrier foil). Positive side effect: No more hot glue runs into the screw guide! Only the approved MULTI-MONTI®-plus SSK 16 x 90 mm concrete screw may be used for attaching the prop to the Hohlwanddübel-Plus. The adhesive plate can be easily removed through a predetermined breaking point. Supplied without screw.

Formwork Accessories
HOHLWANDDÜBEL-PLUS - "K" with adhesive plate

Hohlwanddübel-Plus for temporary fastening of props and corner brackets on double walls in the assembly state. The Hohlwanddübel-Plus is positioned on the formwork at the factory using hot-melt adhesive. Best possible hold due to roughened adhesive surface with Ø 50 mm. A small recess in the adhesive plate ensures minimum consumption of hot-melt adhesive. Alternatively, the Hohlwanddübel-Plus can be attached to steel formwork tables with an adhesive pad (double-sided adhesive on carrier foil). Positive side effect: No more hot-melt adhesive runs into the screw guide! Only the approved MULTI-MONTI®-plus SSK 16 x 130 mm concrete screw may be used for attaching the prop to the Hohlwanddübel-Plus. The adhesive plate can be easily removed through a predetermined breaking point. Supplied without screw.

Formwork Accessories
SCHALROHR NEVOTUBE® "RECHTECK"

FORMWORK TUBE NEVOTUBE® “RECHTECK“ Flexibility: Every producible dimension available within 2 to 3 working days. Delivered to construction site in customised lengths. Lengths of up to 12.5 m have already been realised. Quality: Suitable for exposed concrete quality SB4. According to the DBV leaflet "Fair-faced concrete", the creation of a test area is required for SB4 or strongly recommended for SB3. Resistant to direct exposure to moisture. No horizontal joints of the inner liner up to a length of 4 m. Economy: One concreting date for many columns. This ensures optimum construction progress. Extremely light and easy to handle during transport and assembly. No crane required in most cases. Columns can be stripped in seconds using a knife. No risk of damage to the exposed concrete surface. Environmentally friendly: Cleaning and return transport of the formwork is not necessary. No formwork oil required. Problem-free disposal.

Plastic Formwork Systems
MONOTUB RUND "GLATT" - with ripcord

FORMWORK TUBE MONOTUB RUND "GLATT" Flexibility: Any dimension from Ø 150 mm to Ø 1,200 mm and any length available within 2 to 3 working days. Delivered to construction site in customised lengths. Quality: Suitable for exposed concrete quality SB4. According to the DBV leaflet "Fair-faced concrete", the creation of a test area is required for SB4 or strongly recommended for SB3. 100% waterproof, therefore outdoor storage and installation possible in all weather conditions. With formwork pipes from Ø 650 mm, 2 vertical joints of the PVC insert are visible. Economy: One concreting date for many columns. This ensures optimum construction progress. Extremely light and easy to handle during transport and assembly. No crane required in most cases. Columns can be stripped in seconds using a ripcord. No risk of damage to the exposed concrete surface. Environmentally friendly: Cleaning and return transport of the formwork is not necessary. No formwork oil required. Problem-free disposal.

Plastic Formwork Systems
SCHALROHR NEVOTUBE® “SCHARFE KANTE“

FORMWORK TUBE NEVOTUBE® “SCHARFE KANTE“ Flexibility: Every producible dimension available within 2 to 3 working days. Delivered to construction site in customised lengths. Lengths of up to 12.5 m have already been realised. Quality: Suitable for exposed concrete quality SB4. According to the DBV leaflet "Fair-faced concrete", the creation of a test area is required for SB4 or strongly recommended for SB3. Resistant to direct exposure to moisture. No horizontal joints of the inner liner up to a length of 4 m. Economy: One concreting date for many columns. This ensures optimum construction progress. Extremely light and easy to handle during transport and assembly. No crane required in most cases. Columns can be stripped in seconds using a knife. No risk of damage to the exposed concrete surface. Environmentally friendly: Cleaning and return transport of the formwork is not necessary. No formwork oil required. Problem-free disposal.

Plastic Formwork Systems
  • 4
  • 5
  • 6
  • 7
  • 8
  • 61 - 72 / 536
What We Do
Projects
Categories
Videos
WHO WE ARE
About us
Contact Us
Contact
© 2026 cca.am | All rights reserved